studio stories

Old building. New possibilities – Harbor School

What if a historic building could take on an entirely new purpose without losing the character that makes it special?

This concept for adaptive reuse of a McKim, Mead & White building explores that possibility.

The proposed design would remove a central wing and infill existing courtyards to create the large, open spaces needed for a new pool and gymnasium. The remaining interior spaces would be completely reconfigured to accommodate instructional and administrative functions for a contemporary school.

On the exterior, a proposed contemporary addition uses compatible materials and colors while reinterpreting historic architectural features, including arched openings and metal grillwork in a modern language.

The project remains a concept at this stage, but the design explores an important question: How can we preserve the spirit of a historic building while giving it the flexibility to serve a new generation?

Sometimes adaptive reuse is not about choosing between old and new. It is about finding a thoughtful way to let them coexist.

Preserve the character. Reimagine the possibilities.